Home Build & Renovation Checklist | Coast Essential Construction
Your Complete Planning Resource

What are you
planning?

Building or renovating in the Sea-to-Sky Corridor comes with real risk. Complex sites, permitting delays, budget drift, unclear scope, hidden conditions, and decisions that can become expensive if they are missed early can all affect a project's success. Choose your project type below and use this checklist to ask better questions, compare builders more confidently, and understand what should be documented before construction begins.

Starting Fresh
Custom New
Build
You are building a custom home from the ground up. This checklist helps you evaluate builders, identify site and permit risks, confirm budget controls, and understand what should be documented before construction begins.
Builder evaluation and early involvement
Site, access, and design coordination
Budget, contract, approvals, and warranty review
Project systems, governance, and cost controls
Construction milestones and final handoff
Begin Checklist
Transforming Existing
Major
Renovation
You are planning significant work to an existing home. This checklist helps you define scope, uncover hidden risks, compare renovation contractors, control change orders, and protect your investment through closeout.
Scope clarity and contractor evaluation
Existing conditions and hidden risks
Budget, contract, and change order controls
Project systems, warranty, and quality checks
Renovation milestones and final closeout
Begin Checklist
Custom New Build

Custom Home Build
Checklist

Questions to ask, things to confirm, and warning signs to watch for, from your first builder conversation through final walkthrough.

0/57
Completed

Building a custom home in the Sea-to-Sky Corridor is one of the most significant investments you will make. Whether you are building anywhere in the Sea-to-Sky Corridor, the difference between a project that goes smoothly and one that doesn't almost always comes down to what was asked, confirmed, and documented before construction began.

Work through each section at your own pace. Your progress saves automatically. Items marked with a red indicator are warning signs that deserve a direct conversation with your builder before moving forward.

The builder you choose will have more influence over the outcome of your project than any other decision you make. These items help you identify who is qualified, accountable, and the right fit before a single dollar changes hands.
Licensing & Insurance
Confirm the builder holds a current BC residential builder licence
Verify through BC Housing's Homeowner Protection Office before your first meeting.
Check for any complaints or disciplinary history on fileWatch for
BC Housing maintains a public registry. Unresolved or repeated complaints are worth a direct conversation before proceeding.
Confirm active general liability and Workers' Compensation Board (WCB) coverage
Request a certificate of insurance naming you as certificate holder for the duration of the project.
Confirm the builder offers BC New Home Warranty coverage (2-5-10)
BC's 2-5-10 warranty is mandatory for licensed builders: 2 years on labour and materials, 5 years on building envelope, 10 years on structural defects.
Experience & Portfolio
Request references from completed projects in similar terrain or climate conditions, hillside, waterfront, alpine, or high-precipitation sites
Building in the Sea-to-Sky has specific demands. Ask references whether the builder handled site challenges well, not just whether the home looks good.
Review the portfolio for projects that match your home's size, complexity, and style
Read independent reviews carefully, not just testimonials on their websiteWatch for
Pay attention to how a builder responds to problems, not just whether things went smoothly. Every project has challenges. How they're handled is what matters.
Early Contractor Involvement
Ask whether the builder offers pre-construction services, site review, design input, and early budgeting before permits are pulled
Involving a builder at the design stage catches buildability issues, cost surprises, and scheduling conflicts before they become expensive problems.
Be cautious of builders who are not willing to review your site or drawings until a contract is signedWatch for
A builder who won't engage until money is committed has not assessed your project's specific risks. This is where surprises begin.
In the Sea-to-Sky Corridor, your site is rarely straightforward. Steep terrain, rock, high water tables, wildfire zones, and ALR designations can all affect what gets built and how. These questions ensure nothing is left to assumption before design is finalized.
Site Assessment
Confirm the builder has reviewed your property survey and understands setback, height, and lot coverage restrictions for your municipality
Requirements differ across the Sea-to-Sky Corridor. Jurisdiction experience matters.
Ask whether a geotechnical assessment is recommended given your site's slope, soil type, or proximity to water
Hillside and waterfront sites in this region often require a geotech report before building permits will be issued.
Confirm whether your site is in a designated wildfire interface zone and understand any related design or material requirements
Ask what site servicing is required and confirm whether road access, utilities, and drainage infrastructure exist or need to be brought inWatch for
Previously undeveloped lots in this corridor frequently require significant servicing infrastructure. Costs can be substantial and are not always included in an initial builder quote.
Design Coordination
Confirm the builder has reviewed the full set of architectural drawings and structural engineering before quoting
A quote based on incomplete drawings is not a reliable number. Make sure the builder has seen everything.
Ask how the builder communicates with your architect and designer during construction, who is responsible for resolving conflicts between drawings and field conditions?
Confirm all finish selections, cladding, roofing, windows, flooring, millwork, are documented in writing before the contract is signed
Verbal material agreements are nearly impossible to enforce. Written specifications protect you and keep the budget accurate.
Clarify explicitly what is not included in the quoteWatch for
Landscaping, site grading beyond the footprint, detached structures, site lighting, and some mechanical rough-ins are frequently excluded without being stated.

Worth noting: The BC Energy Step Code applies to all new residential construction. Ask your builder which Step your home is targeting and what that means for your envelope, mechanical systems, and long-term operating costs. Step 3 is the current minimum in most municipalities, but Whistler and some others are moving to higher requirements.

The contract is where your entire agreement becomes enforceable. A thorough review here protects you through the full length of the project. If something is unclear, ask before signing.
Scope & Pricing
Confirm the full scope of work, all materials and finishes, and all subcontractors are referenced in the contract
Understand whether the contract is fixed-price or cost-plus, and what that means for your exposure if costs increase
Cost-plus contracts offer transparency on actual costs but require trust and oversight. Fixed-price contracts shift more risk to the builder but require a complete scope to price accurately.
Understand the payment schedule and confirm draws are tied to construction milestones, not calendar dates
Large upfront deposits that are not tied to completed work are a risk. Progress draws aligned to milestones keep incentives aligned.
Ask what contingency is built into the budget and what categories it covers
A 10–15% contingency is standard for custom builds. Understand whether it sits with the builder or the owner, and what triggers its use.
Timeline & Permits
Confirm the estimated start date, overall construction timeline, and which conditions could cause delays
Permit timelines vary across the Sea-to-Sky Corridor. A realistic schedule accounts for permitting, not just construction days. A realistic schedule accounts for permitting, not just construction days.
Confirm the builder will pull all required permits and that permit fees are either included in the quote or clearly identified as owner-paid
Warranty & Liens
Confirm BC New Home Warranty (2-5-10) coverage is in place and understand what each component covers
Understand how builder's liens work in BC and ask how the builder handles holdback requirementsWatch for
BC's Builders Lien Act requires a 10% holdback on each draw, released after the lien period expires. Confirm this process is followed so your property is protected.

Good to know: If your project involves a construction mortgage, your lender will have their own draw inspection process. Confirm with your builder early that their payment schedule aligns with how your lender releases funds. Misalignment here causes cash flow problems mid-build.

A custom home has hundreds of decisions, revisions, selections, quotes, consultant comments, and site instructions. Without a clear system, information gets missed, costs drift, and accountability becomes unclear. Before hiring a builder, confirm they have a formal process for managing project information, budgets, approvals, changes, and communication.
Information & Document Control
Does the builder use a formal project management system?
A good answer names the platform and explains how the owner, designer, trades, and consultants all interact with it. A vague answer like "we use email and spreadsheets" is the warning.
Is there one central place for drawings, specifications, selections, RFIs, schedules, budgets, change orders, and approvals?
How does the builder make sure outdated drawings or superseded information are not used on site?
Look for a clear version control process where the latest set is stamped or flagged, old sets are removed or archived, and the trades know where to pull the current drawing from. Verbal updates do not count.
How are owner decisions documented and approved?
How are architect, designer, engineer, and consultant instructions tracked?
How are RFIs, clarifications, and design changes managed?
Budget & Cost Reporting
How are allowances, contingencies, committed costs, pending costs, and projected final costs tracked?
How often will the owner receive budget updates?
Will budget reports show original budget, approved changes, pending changes, actual costs, committed costs, and projected final cost?
A real budget report has all of those columns. If a builder only shows a single "spent to date" number, you cannot see where the project is heading.
Change Order & Approval Authority
How are change orders priced, reviewed, approved, and documented before work proceeds?
The right answer is a written change order with cost and timeline impact, signed by the owner, before any work starts. Anything less and disputes show up at final payment.
Who has authority to approve cost changes?
Scope, Quality & Risk Review
How are scope gaps, trade overlaps, exclusions, and unclear details identified before construction starts?
A strong builder will describe a pre-construction review where drawings are checked against trade scopes and unclear details are resolved on paper, not in the field.
How are high-risk details reviewed before they are installed?
How are quality expectations, tolerances, and finish standards communicated to trades?
How are site instructions, deficiencies, action items, and follow-up items tracked?Watch for
Be cautious if a builder relies mostly on memory, texts, phone calls, or scattered emails to manage the project. On a custom home, poor documentation leads to budget surprises, missed decisions, trade conflicts, delays, and unclear accountability.
You do not need to be on site every day, but knowing what to look for at each stage keeps the project on track and the builder accountable. These are the moments where attention matters most.
Communication & Updates
Confirm your dedicated point of contact during construction and how frequently updates will be provided
Ask who to contact if you have a concern while work is underway, there should be a direct line, not a message relayed through the site crew
Construction Milestones
Site prep and excavation: confirm the building footprint and grades match the approved drawings before foundation work begins
Foundation: confirm foundation type aligns with engineering drawings and that inspections are passed before framing begins
On rocky or sloped sites, foundation work can be more complex than anticipated. This is the stage to flag concerns early.
Framing: confirm framing inspection is passed and structure matches the architectural drawings
Building envelope: confirm all weather-resistive barriers, flashing, and window/door installations are complete and inspected before cladding goes on
In the Sea-to-Sky, the building envelope is everything. Once cladding is applied, deficiencies in the drainage plane are hidden and expensive to fix.
Mechanical and electrical rough-in: confirm all systems are roughed in, inspected, and any issues resolved before drywall is closed
Document any deviation from the approved drawings in writing before authorizing the builder to proceedWatch for
Field decisions made verbally and without a change order create disputes at project closeout. Everything that changes the approved scope should be in writing.
The final walkthrough is your opportunity to confirm that everything was delivered as agreed. Take your time. A thorough review here protects you long after the builder leaves the site.
Finishes & Systems
Confirm all interior and exterior finishes match approved selections, cladding, flooring, cabinetry, tile, fixtures
Walk every room for deficiencies: incomplete paint, damaged trim, gaps at transitions, hardware that doesn't operate correctly
Watch the builder operate all mechanical and electrical systems live: heating, HRV, plumbing, electrical panel, automation
Do not accept handoff without a live demonstration of every system, including any smart home or automated features.
Inspect the exterior cladding, roofing, and flashing for any visible deficiencies before weather makes it difficult to assess
Documentation
Receive a copy of the final building inspection sign-off and occupancy permit before moving in
Receive all equipment manuals, warranty documents, and maintenance instructions
Confirm any outstanding punch list items are documented in writing with a committed completion date before releasing final payment
Do not release the full final payment until the builders lien holdback period has expired or lien releases are received from all subcontractors and suppliersWatch for
Under BC's Builders Lien Act, subcontractors and suppliers have the right to lien your property. Holdback requirements exist to protect you, follow them.
Confirm BC New Home Warranty registration is in place and you have received your warranty documentation package
Major Renovation

Home Renovation
Checklist

What to assess, ask, and verify when undertaking a significant renovation, from initial scope through final review.

0/59
Completed

A major renovation can range from a full gut and rebuild to a targeted transformation of specific spaces. The scope varies widely, and so do the risks. The most common problems in renovation work stem from unclear scope, undiscovered existing conditions, and change orders that weren't anticipated.

This checklist is built specifically for renovation work. Items marked with a red indicator are warning signs that deserve a direct conversation with your contractor before you proceed.

Renovation work requires a different skill set than new construction. The contractor you hire needs experience assessing what already exists, not just building from scratch. In the Sea-to-Sky, older homes often carry surprises once walls come open.
Licensing & Insurance
Confirm the contractor holds a current BC residential builder or renovation licence appropriate for the scope
Verify through BC Housing before your first meeting. Unlicensed contractors cannot provide New Home Warranty coverage, which may be required for significant structural work.
Confirm active general liability and WCB coverage
Renovation Experience
Ask how many renovation projects of similar scale the company completes each year
New construction experience alone does not prepare a contractor for the diagnostic and adaptive requirements of renovation work.
Request references from completed renovations of similar scope, ask those references how the contractor handled unexpected conditions and whether communication was clear throughout
Be cautious of contractors who quote a renovation without a thorough in-person assessment of the existing conditionsWatch for
Accurate renovation pricing requires physically assessing the existing structure, systems, and finishes. A quote based on photos or description alone is not reliable.
Read independent reviews with specific attention to how hidden conditions and change orders were handledWatch for
In renovation work, surprises are common. The question is whether the contractor communicated and resolved them fairly when they arose.
The most common source of renovation disputes is a mismatch between what the homeowner thought was included and what the contractor actually quoted. Establish scope clearly before anything else.
Scope Definition
Confirm in writing exactly what is included in the renovation, structural work, finishes, mechanical, electrical, or some combination
A "renovation" can mean very different things to different people. Make sure every line item is explicit.
Clarify what is being retained vs. replaced vs. upgraded, structure, systems, finishes
Existing Conditions
Ask the contractor to assess the condition of the existing structure, envelope, and systems before quoting
In Sea-to-Sky homes, moisture-related issues in the building envelope, aging mechanical systems, and outdated electrical are common. Surface appearances don't tell the full story.
If the home was built before 1990, ask about testing for asbestos or other hazardous materials before any demolition work begins
Remediation is a separate cost and requires licensed abatement. Knowing this before demolition prevents costly surprises.
Renovation contracts carry risks that new construction contracts do not. The provisions around hidden conditions, change orders, and contingency deserve particular attention.
Scope & Pricing
Confirm every line item of the renovation is listed explicitly in the contract
Understand the payment schedule and confirm draws are milestone-based, not calendar-based
Confirm all finish and material selections are documented in the contract before signing
Ask what contingency is appropriate for the scope and confirm how it will be managed
A 15–20% contingency is reasonable for major renovations given the unknowns of existing construction. Know whether this sits with you or the contractor and what it covers.
Timeline & Permits
Confirm the estimated project duration from demolition start through final inspection
Renovation timelines are harder to predict than new construction. Get a realistic range that accounts for potential discoveries.
Confirm which permits are required for the scope of work and who is responsible for obtaining them
Structural, mechanical, and electrical work all typically require permits. Cosmetic work often does not. Know which category your project falls into before work starts.
Liens & Holdback
Confirm the 10% BC Builders Lien holdback process is being followed on each drawWatch for
BC's Builders Lien Act requires holdback on each payment to protect you from subcontractor liens. This applies to renovations as much as new construction.
Renovations can become expensive when scope, decisions, hidden conditions, and changes are not clearly documented. Existing homes often reveal issues only after demolition begins, so it is important that your contractor has a clear system for managing communication, pricing, approvals, and project records. Before hiring a renovation contractor, confirm how they will document the original scope, track discoveries, price changes, and keep the owner informed as the project evolves.
Information & Document Control
Does the contractor use a formal project management system?
A good answer names the platform and explains how drawings, decisions, photos, and approvals all live in one place. "We just text" is the warning sign.
Is there one central place for drawings, specifications, selections, site photos, schedules, budgets, change orders, and approvals?
Scope & Existing Conditions
How is the original renovation scope documented before work begins?
How are exclusions, assumptions, and allowances clearly identified?
How are existing conditions documented before demolition?
Look for a written and photographed record of the existing structure, finishes, and systems before any demolition starts. This protects you later when something needs to be repaired or replaced.
How are hidden conditions photographed, reviewed, and priced before repair work proceeds?
Discovery, photo documentation, a written assessment, a priced change order, and owner approval, in that order, before any new work begins. This is the single biggest source of dispute on renovations.
Decisions, Approvals & Instructions
How are owner decisions recorded and approved?
How are designer, engineer, and consultant instructions tracked?
Change Orders & Cost Authority
How are change orders priced, reviewed, approved, and documented before work continues?
A written change order signed by the owner before work starts. If a contractor says "we just adjust at the end," expect surprises on the final invoice.
Who has authority to approve cost changes?
Budget Reporting & Schedule Impact
How often will the owner receive budget updates?
Will cost reports show the original budget, approved changes, pending changes, actual costs, committed costs, and projected final cost?
How are schedule impacts from hidden conditions or owner changes communicated?
Deficiencies & Warranty Tracking
How are deficiencies, action items, and follow-up items tracked?
How are warranty items submitted, tracked, and resolved after completion?Watch for
Be cautious if a renovation contractor relies mostly on texts, verbal conversations, or loose emails to manage the job. Renovations move quickly, and poor documentation can lead to budget creep, unclear approvals, scope disputes, missed details, and frustration after the work is complete.
Renovation milestones are different from new construction. The moments that matter most are when existing conditions are exposed and decisions need to be made quickly.
Demolition & Discovery
Ask to be notified immediately if any unexpected conditions are found during demolition, moisture, structural issues, hazardous materials, or code deficiencies
These discoveries require a decision before work continues. You should hear about them directly, not through a change order after the fact.
Do not authorize any additional work verbally, require a written change order before work proceeds beyond the original scopeWatch for
A contractor who moves ahead without written authorization is putting you in a difficult position at payment time.
Construction Milestones
If structural work is included, confirm framing inspections are passed before walls are closed
If building envelope work is included, confirm all flashing, membranes, and drainage details are in place and inspected before cladding is applied
Envelope deficiencies in this climate are serious. Once cladding is on, problems are hidden and expensive to diagnose.
If mechanical or electrical work is included, confirm rough-in inspections are passed before drywall is closed
Verify that all installed materials match your approved selections before they are permanently fixed
Renovations should still come with clear warranty expectations. A professional renovation contractor should be willing to put their warranty policy in writing before work begins, including what is covered, what is excluded, how long coverage lasts, and how issues will be handled after completion. Many renovation problems do not show up until after the project is finished and the home is being used. That is why warranty, closeout, product documentation, and post-completion support should be discussed before the contract is signed.
Warranty Coverage
Does the contractor provide a written renovation warranty policy?
A written policy is the baseline. If a contractor will not put their warranty in writing before the contract is signed, you have no way to enforce it after the work is done.
How long is workmanship covered after completion?
A year on workmanship is the minimum to expect from a professional renovation contractor. Some offer longer coverage on specific systems.
What labour and materials are covered by the contractor?
What products are covered only by manufacturer warranties?
Are subcontractor warranties collected and passed on to the owner?
Who coordinates warranty claims with suppliers, trades, and manufacturers?
Exclusions & Maintenance
What is excluded from warranty coverage?
A reasonable list might include normal wear, owner-caused damage, or pre-existing conditions outside the renovation scope. A vague "depends on the issue" answer leaves you exposed.
Are issues caused by existing conditions excluded or handled separately?
Are maintenance requirements clearly explained to the owner?
Closeout & Deficiencies
Is there a formal deficiency walkthrough before final payment?
A scheduled walkthrough, a written deficiency list, and committed completion dates before the final payment is released. This is your last leverage point to get items resolved.
Are deficiencies documented in writing and tracked to completion?
Will the owner receive manuals, product information, finish schedules, and warranty documents at closeout?
Post-Completion Support
Is there a post-completion check-in after the home has been lived in?
How are warranty requests submitted, reviewed, tracked, and closed out?Watch for
Be cautious if a renovation contractor says there is "no warranty on renovations," refuses to provide warranty terms in writing, or only points to manufacturer warranties. Product warranties do not replace responsibility for workmanship, installation quality, coordination, and post-completion support.
The final review is your last opportunity to confirm everything was delivered as agreed. A thorough walkthrough here protects you long after the contractor leaves.
Finishes & Systems
Confirm all finishes match the approved selections, flooring, tile, paint, cabinetry, fixtures, and hardware
Walk every renovated area for deficiencies: gaps at transitions, incomplete caulking, hardware that doesn't operate, paint misses
Watch the contractor operate any new or modified mechanical systems, heating, HRV, plumbing, electrical
New systems should be demonstrated, not just confirmed as installed.
Receive all equipment manuals and warranty documentation for any new systems or appliances installed
Documentation & Payment
Receive final permit sign-offs and inspection certificates for any permitted work
Confirm any outstanding punch list items are documented in writing with committed completion dates before releasing final payment
Do not release the final payment until the builders lien holdback period has expired or lien releases are received from all subcontractors and suppliersWatch for

One more thing: Keep a complete record of all permits, inspections, warranties, and change orders from the project. These documents have real value at resale and will be requested by any future buyer doing due diligence.

© 2026 Coast Essential Construction  |  Sea-to-Sky Corridor, BC  |  coastessential.com  |  604.390.2299

This website uses cookies to ensure you get the best experience from your visit.

Before After
Before After
Before After