The budget and a reasonable time frame are stated in the contract, which is signed by all parties with copies provided before the start any project. If by chance the project does run late it is usually caused by two reasons; one, weather and two, materials deliveries. If it’s not due to nature or outside forces, we do what we say, when we say.
Again, these terms are broken down in the contract based on progress with a completion date included. Typically we take a deposit of 10% for materials, and the rest of the payments are determined beforehand. Once the work is completed to a pre-determined point, a pre-determined payment is made, with final payment due upon completion. This is called progress payments.
Depending on your location and what is being done, a permit might be required or it may not. If a permit is required for your project, we will obtain the permit, handle all inspections, make sure everything is built to code, and that the project and process satisfies all requirements to the letter of the law.
Important materials are specified in the contract. All materials are covered, however, as substitutions are sometimes unavoidable (lots of bricks run out, for example, colors of materials are sometimes no longer made), we make it clear that an equal substitution will be made but only upon your approval. For items such as lighting fixtures or doorknobs that you have not chosen when the contract is signed, a budget is determined in the contract to cover exactly what will be spent on them.